FAST 3.06-01 Row anchor all links
FAST-3.06-01.1 except when setting up to replicate sections
It is preferable to remove row anchoring on links when setting up a calculation block that will be replicated a number of times. This will ensure that when the calculation block is copied, the calculation points to precedents within the new calculation block, and does not hold on to references from the source calculation block.
FAST 3.06-02 Do not create daisy chains; do not link to links
In general terms, a daisy chain is series of linked links. The last link does not form a direct link to the original source of the figures, an input or calculation, but instead is linked to an intermediate link, which in turn is linked to the first object, forming a series.